CITY OF ROSSFORD, OHIO
|
| Owner's Name | Owner's Agent |
| _______________________________________ | Name of Firm ____________________________________ |
| _______________________________________ | Street Address_________________________________ |
| _______________________________________ | City, Town, etc______________________________________ |
| _______________________________________ | Telephone Number:_________________________________ |
Type of Occupancy__________________________________________________________________
Legal Description of Property:__________________________________________________________
Located on the _________________ Side of _________________________________________Street
Type of Building Sewer to be Installed___________________________________________________
Size of Building Sewer __________________Inch Size of Public Sewer ____________________Inch
Nature of Construction (CHECK ONE) /___ / New /___ / Repair
Estimated Cost of Work:______________________________________________________________
Metered Water __________Yes __________No Charges: Inspection Fee___________________
Installed By:____________________________________ __________________________________
Inspected By:___________________________________ __________________________________
Date Installed ___________________________________ Total Charge________________________
Make Checks payable to: City of Rossford, Ohio
The undersigned hereby makes application for a permit for the construction, installation, replacemtn or repair as herein specified and agrees to do all such work in strict accordance with the City of Rossford, and Wood County Board of Health, and the undersigned further agrees that all claims for damages against the City which may be occasioned in any manner by the putting in of said building sewer, shall be waived and held null and void; and the undersigned shall indemnify and save harmless the City of Rossford from any and all claims whatsoever occasioned by the construction of said improvement.
Signature of Applicant:_______________________________________________________________
Address:_______________________________________________________________
NOTE: This receipt not valid until receipted by City Sewer Department. Permit shall be left on job site.
Page 2 of 4
Sewer Permit No.
Building Sewer Installation Information
(NOTE: The work shall be completed and this form filled out and returned to the Rossford Sewer Department Office within thirty (30) days after permit is issued. The owner is to have the right to make new application if work is not completed within the specified time.)
For Lot. No. _____________________ located on _________________________side of
________________________________ in
______________________________________________
Street Name
City,
Township, Etc.
lot owned by______________________________________________________________________
Connection enters lot______________________________ feet
from _________________________
line of said property.
Installed _______________________(total length) feet, of __________________inch, Building Sewer, as shown in sketch on back side of this form.
I hereby certify, that the above connection was properly
made by me on the day of ____________________, 19 _____, in conformity with the rules and
regulations of the City of Rossford, governing the construction of sewer connections with
all of which I am familiar; that the connection was made in a proper manner without
damaging the main or principal sewer; that said connection was laid to a true and proper
grade, and constructed of
____________________________________________________________
sewer pipe, with premium joints properly jointed and tight, and connected at the upper end
with cast iron soil pipe; and that the whole was left clean and in good condition.
ROSSFORD, OHIO
Date_____________________________________
________________________________________ (Building Sewer Contractor)
This work inspected and approved this____________________ day of
______________________________, 19 ____.
______________________________________
(INSPECTOR)
Page 3 of 4
SUMMARY OF REGULATIONS FOR THE MAKING OF BUILDING SEWER CONNECTIONS WITH PUBLIC SEWERS.
BUILDING SEWER LOCATION PLAN
Approximate distance from ground level to point of connection
___________________________ feet.NOTE: Building Sewer Contractor shall sketch in the location of Sewer as installed, giving distances and dimensions to bends, wyes, cleanouts, end of line, etc. Also show street names, north direction, distance to manholes both ways from the connection and any other pertinent information. This installation form must be returned to make the permit complete.
Page 4 of 4
BUILDING SEWER LOCATION PLAN
Approximate distance from ground level to point of connection
____________________feet.